Streetscape Master Plan

From the Streetscape Master Plan draft:

The following recommendations outline a series of specific projects and improvements tailored to each of the “districts” identified above. The recommendations are not an exhaustive list but represent the key priorities identified by consensus as part of the Master Plan process.

SOUTH MAIN STREET (NEW CUT ROAD)

Existing Sidewalk (West Side)
• Maintain current sidewalk on the west side
• Construct replacement sidewalks to match other new Town sidewalks over time

Future Trail & Sidewalk Extensions
• Extend sidewalk to connect with new trail to Town Park
• Extend trail connections, when feasible, along Route 719 south

Trail to Town Park
• Extend new trail along existing easements from New Cut Road to Town Park

Future Crosswalk
• Develop new crosswalk across New Cut Road to connect sidewalk to Town Park trial. However, ensure traffic calming along Route 719 to protect pedestrian safety at crosswalks

Southern Gateway
• Develop traffic calming strategy along south gateway to manage traffic speed entering Town

Back to Streetscape Master Plan