Streetscape Master Plan

From the Streetscape Master Plan draft:

The following recommendations outline a series of specific projects and improvements tailored to each of the “districts” identified above. The recommendations are not an exhaustive list but represent the key priorities identified by consensus as part of the Master Plan process.

WEST LOUDOUN STREET

Sidewalk to Arts Center (South Side)
• Extend sidewalk to the Arts Center building
• Expand sidewalk into private plaza as terminus to sidewalk and integrate design with streetscape

Arts Center
• The Town should work with the property owner to implement compatible façade improvements over time
• Preserve open space along Loudoun Street as a private plaza or green space compatible with the streetscape

Existing Sidewalk – North Side
• Maintain current sidewalk on the north side
• Construct replacement sidewalks to match other new Town sidewalks over time

United Methodist Church Improvements
• Work with congregation to ensure improvements are compatible with the proposed streetscape and storm water management plan recommendations

Webster Property
• Work with developer/owner to ensure visual compatibility of this key western gateway property
• Design landscape, building and architectural enhancements to make an attractive viewshed from Loudoun Street

Future Trail Connections
• Develop future trail connection along Route 7, when feasible, to Hill High Orchard and stream valley/open space systems in the Fallswood and Stoneleigh communities